Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />e. Review of spare parts needed for operation and maintenance. <br />PART 3 - EXECUTION <br />3.1 PREPARATION <br />A. Assemble educational materials necessary for instruction, including documentation and training <br />module. Assemble training modules into a training manual organized in coordination with <br />requirements in Section 017823 "Operation and Maintenance Data." <br />B. Set up instructional equipment at instruction location. <br />3.2 INSTRUCTION <br />A. Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain <br />systems, subsystems, and equipment not part of a system. <br />1. Owner will furnish Contractor with names and positions of participants. <br />B. Scheduling: Provide instruction at mutually agreed on times. For equipment that requires <br />seasonal operation, provide similar instruction at start of each season. <br />1. Schedule training with Owner, through Architect, with at least seven days' advance <br />notice. <br />C. Training Location and Reference Material: Conduct training on -site in the completed and fully <br />operational facility using the actual equipment in- place. Conduct training using final operation <br />and maintenance data submittals. <br />D. Evaluation: At conclusion of each training module, assess and document each participant's <br />mastery of module by use of an oral and/or a demonstration performance -based test. <br />E. Cleanup: Collect used and leftover educational materials and give to Owner. Remove <br />instructional equipment. Restore systems and equipment to condition existing before initial <br />training use. <br />END OF SECTION 017900 <br />DEMONSTRATION AND TRAINING 017900-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.