Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />A. Coordinate instruction schedule with Owner's operations. Adjust schedule as required to <br />minimize disrupting Owner's operations and to ensure availability of Owner's personnel. <br />B. Coordinate instructors, including providing notification of dates, times, length of instruction <br />time, and course content. <br />C. Coordinate content of training modules with content of approved emergency, operation, and <br />maintenance manuals. Do not submit instruction program until operation and maintenance data <br />has been reviewed and approved by Architect. <br />PART 2- PRODUCTS <br />2.1 INSTRUCTION PROGRAM <br />A. Program Structure: Develop an instruction program that includes individual training modules <br />for each system and for equipment not part of a system, as required by individual Specification <br />Sections. <br />B. Training Modules: Develop a learning objective and teaching outline for each module. Include <br />a description of specific skills and knowledge that participant is expected to master. For each <br />module, include instruction for the following as applicable to the system, equipment, or <br />component: <br />1. Basis of System Design, Operational Requirements, and Criteria: Include the following: <br />a. System, subsystem, and equipment descriptions. <br />b. Performance and design criteria if Contractor is delegated design responsibility. <br />C. Operating standards. <br />d. Regulatory requirements. <br />e. Equipment function. <br />f. Operating characteristics. <br />g. Limiting conditions. <br />h. Performance curves. <br />2. Documentation: Review the following items in detail: <br />a. Emergency manuals. <br />b. Operations manuals. <br />C. Maintenance manuals. <br />d. Project record documents. <br />e. Identification systems. <br />f. Warranties and bonds. <br />g. Maintenance service agreements and similar continuing commitments. <br />3. Emergencies: Include the following, as applicable: <br />a. Instructions on meaning of warnings, trouble indications, and error messages. <br />DEMONSTRATION AND TRAINING 017900-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.