Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />6. Note Construction Change Directive numbers, alternate numbers, Change Order <br />numbers, and similar identification, where applicable. <br />B. Format: Identify and date each record Drawing; include the designation "PROJECT RECORD <br />DRAWING" in a prominent location. <br />1. Record Prints: Organize record prints and newly prepared record Drawings into <br />manageable sets. Bind each set with durable paper cover sheets. Include identification <br />on cover sheets. <br />2. Identification: As follows: <br />a. Project name. <br />b. Date. <br />C. Designation "PROJECT RECORD DRAWINGS." <br />d. Name of Architect. <br />e. Name of Contractor. <br />2.2 RECORD SPECIFICATIONS <br />A. Preparation: Mark Specifications to indicate the actual product installation where installation <br />varies from that indicated in Specifications, addenda, and contract modifications. <br />1. Give particular attention to information on concealed products and installations that <br />cannot be readily identified and recorded later. <br />2. Mark copy with the proprietary name and model number of products, materials, and <br />equipment furnished, including substitutions and product options selected. <br />3. Record the name of manufacturer, supplier, Installer, and other information necessary to <br />provide a record of selections made. <br />4. For each principal product, indicate whether record Product Data has been submitted in <br />operation and maintenance manuals instead of submitted as record Product Data. <br />5. Note related Change Orders, record Product Data, and record Drawings where applicable. <br />B. Format: Submit record Specifications as paper copy. <br />2.3 RECORD PRODUCT DATA <br />A. Preparation: Mark Product Data to indicate the actual product installation where installation <br />varies substantially from that indicated in Product Data submittal. <br />1. Give particular attention to information on concealed products and installations that <br />cannot be readily identified and recorded later. <br />2. Include significant changes in the product delivered to Project site and changes in <br />manufacturer's written instructions for installation. <br />3. Note related Change Orders, record Specifications, and record Drawings where <br />applicable. <br />PROJECT RECORD DOCUMENTS 017839-3 <br />