Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />B. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care <br />and maintenance of each product, material, and finish incorporated into the Work. <br />C. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance <br />data indicating operation and maintenance of each system, subsystem, and piece of equipment <br />not part of a system. <br />1. Engage a factory- authorized service representative to assemble and prepare information <br />for each system, subsystem, and piece of equipment not part of a system. <br />2. Prepare a separate manual for each system and subsystem, in the form of an instructional <br />manual for use by Owner's operating personnel. <br />D. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include <br />only sheets pertinent to product or component installed. Mark each sheet to identify each <br />product or component incorporated into the Work. If data include more than one item in a <br />tabular format, identify each item using appropriate references from the Contract Documents. <br />Identify data applicable to the Work and delete references to information not applicable. <br />Prepare supplementary text if manufacturers' standard printed data are not available and <br />where the information is necessary for proper operation and maintenance of equipment or <br />systems. <br />E. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the <br />relationship of component parts of equipment and systems and to illustrate control sequence and <br />flow diagrams. Coordinate these drawings with information contained in record Drawings to <br />ensure correct illustration of completed installation. <br />1. Do not use original project record documents as part of operation and maintenance <br />manuals. <br />2. Comply with requirements of newly prepared record Drawings in Section 017839 <br />"Project Record Documents." <br />F. Comply with Section 017700 "Closeout Procedures" for schedule for submitting operation and <br />maintenance documentation. <br />END OF SECTION 017823 <br />OPERATION AND MAINTENANCE DATA 017823-8 <br />