Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />[►• Ej � A]9 17_r0M h1 MJ, 0, l$A rl <br />A. Content: In addition to requirements in this Section, include operation data required in <br />individual Specification Sections and the following information: <br />1. System, subsystem, and equipment descriptions. Use designations for systems and <br />equipment indicated on Contract Documents. <br />2. Performance and design criteria if Contractor has delegated design responsibility. <br />3. Operating standards. <br />4. Operating procedures. <br />5. Operating logs. <br />6. Wiring diagrams. <br />7. Control diagrams. <br />8. Piped system diagrams. <br />9. Precautions against improper use. <br />10. License requirements including inspection and renewal dates. <br />B. Descriptions: Include the following: <br />1. Product name and model number. Use designations for products indicated on Contract <br />Documents. <br />2. Manufacturer's name. <br />3. Equipment identification with serial number of each component. <br />4. Equipment function. <br />5. Operating characteristics. <br />6. Limiting conditions. <br />7. Performance curves. <br />8. Engineering data and tests. <br />9. Complete nomenclature and number of replacement parts. <br />C. Operating Procedures: Include the following, as applicable: <br />1. Startup procedures. <br />2. Equipment or system break -in procedures. <br />3. Routine and normal operating instructions. <br />4. Regulation and control procedures. <br />5. Instructions on stopping. <br />6. Normal shutdown instructions. <br />7. Seasonal and weekend operating instructions. <br />8. Required sequences for electric or electronic systems. <br />9. Special operating instructions and procedures. <br />D. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as <br />installed. <br />E. Piped Systems: Diagram piping as installed, and identify color - coding where required for <br />identification. <br />OPERATION AND MAINTENANCE DATA 017823 -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.