Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />1. Clean ducts, blowers, and coils if units were operated without filters during <br />construction or that display contamination with particulate matter on inspection. <br />1) Clean HVAC system in compliance with NADCA Standard 1992 -01. <br />Provide written report on completion of cleaning. <br />m. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. <br />n. Leave Project clean and ready for occupancy. <br />C. Pest Control: Comply with pest control requirements in Section 015000 "Temporary Facilities <br />and Controls." Prepare written report. <br />D. Construction Waste Disposal: Comply with waste disposal requirements in Section 017419 <br />"Construction Waste Management and Disposal." <br />3.2 REPAIR OF THE WORK <br />A. Complete repair and restoration operations before requesting inspection for determination of <br />Substantial Completion. <br />B. Repair or remove and replace defective construction. Repairing includes replacing defective <br />parts, refinishing damaged surfaces, touching up with matching materials, and properly <br />adjusting operating equipment. Where damaged or worn items cannot be repaired or restored, <br />provide replacements. Remove and replace operating components that cannot be repaired. <br />Restore damaged construction and permanent facilities used during construction to specified <br />condition. <br />1. Remove and replace chipped, scratched, and broken glass, reflective surfaces, and other <br />damaged transparent materials. <br />2. Touch up and otherwise repair and restore marred or exposed finishes and surfaces. <br />Replace finishes and surfaces that that already show evidence of repair or restoration. <br />a. Do not paint over "UL" and other required labels and identification, including <br />mechanical and electrical nameplates. Remove paint applied to required labels and <br />identification. <br />3. Replace parts subject to operating conditions during construction that may impede <br />operation or reduce longevity. <br />4. Replace burned -out bulbs, bulbs noticeably dimmed by hours of use, and defective and <br />noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for <br />new fixtures. <br />END OF SECTION 017700 <br />CLOSEOUT PROCEDURES 017700-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.