Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />XVEEM I-1-ZM I1►M2 19 1D1L&%V10R11_� : I <br />A. Schedule of Maintenance Material Items: For maintenance material submittal items specified in <br />other Sections. <br />1we�tllllll :31. I1I:112M1I /:lr[ 416]► iIaaiIII [Ooi']:Z9ZyQD1i7 ti 161 <br />A. Contractor's List of Incomplete Items: Prepare and submit a list of items to be completed and <br />corrected (Contractor's punch list), indicating the value of each item on the list and reasons why <br />the Work is incomplete. <br />B. Submittals Prior to Substantial Completion: Complete the following a minimum of 10 days <br />prior to requesting inspection for determining date of Substantial Completion. List items below <br />that are incomplete at time of request. <br />1. Certificates of Release: Obtain and submit releases from authorities having jurisdiction <br />permitting Owner unrestricted use of the Work and access to services and utilities. <br />Include occupancy permits, operating certificates, and similar releases. <br />2. Submit closeout submittals specified in other Division 01 Sections, including project <br />record documents, operation and maintenance manuals, final completion construction <br />photographic documentation, damage or settlement surveys, property surveys, and similar <br />final record information. <br />3. Submit closeout submittals specified in individual Sections, including specific warranties, <br />workmanship bonds, maintenance service agreements, final certifications, and similar <br />documents. <br />4. Submit maintenance material submittals specified in individual Sections, including tools, <br />spare parts, extra materials, and similar items, and deliver to location designated by <br />Architect. Label with manufacturer's name and model number where applicable. <br />a. Schedule of Maintenance Material Items: Prepare and submit schedule of <br />maintenance material submittal items, including name and quantity of each item <br />and name and number of related Specification Section. Obtain Architect's <br />signature for receipt of submittals. <br />5. Submit test /adjust/balance records. <br />6. Submit changeover information related to Owner's occupancy, use, operation, and <br />maintenance. <br />C. Procedures Prior to Substantial Completion: Complete the following a minimum of 10 days <br />prior to requesting inspection for determining date of Substantial Completion. List items below <br />that are incomplete at time of request. <br />1. Advise Owner of pending insurance changeover requirements. <br />2. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's <br />personnel of changeover in security provisions. <br />3. Complete startup and testing of systems and equipment. <br />4. Perform preventive maintenance on equipment used prior to Substantial Completion. <br />5. Instruct Owner's personnel in operation, adjustment, and maintenance of products, <br />equipment, and systems. Submit demonstration and training video recordings specified <br />in Section 017900 "Demonstration and Training." <br />CLOSEOUT PROCEDURES 017700-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.