Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />5. Install salvaged items to comply with installation requirements for new materials and <br />equipment. Provide connections, supports, and miscellaneous materials necessary to <br />make items functional for use indicated. <br />B. Salvaged Items for Sale and Donation: Not permitted on Project site. <br />C. Salvaged Items for Owner's Use: Salvage items for Owner's use and handle as follows: <br />1. Clean salvaged items. <br />2. Pack or crate items after cleaning. Identify contents of containers with label indicating <br />elements, date of removal, quantity, and location where removed. <br />3. Store items in a secure area until delivery to Owner. <br />4. Transport items to Owner's storage area off -site designated by Owner. <br />5. Protect items from damage during transport and storage. <br />D. Doors and Hardware: Brace open end of door frames. Except for removing door closers, leave <br />door hardware attached to doors. <br />E. Equipment: Drain tanks, piping, and fixtures. Seal openings with caps or plugs. Protect <br />equipment from exposure to weather. <br />F. Plumbing Fixtures: Separate by type and size. <br />G. Lighting Fixtures: Separate lamps by type and protect from breakage. <br />H. Electrical Devices: Separate switches, receptacles, switchgear, transformers, meters, <br />panelboards, circuit breakers, and other devices by type. <br />3.3 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL <br />A. General: Recycle paper and beverage containers used by on -site workers. <br />B. Recycling Incentives: Revenues, savings, rebates, tax credits, and other incentives received for <br />recycling waste materials shall accrue to Contractor. <br />C. Preparation of Waste: Prepare and maintain recyclable waste materials according to recycling <br />or reuse facility requirements. Maintain materials free of dirt, adhesives, solvents, petroleum <br />contamination, and other substances deleterious to the recycling process. <br />D. Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate <br />recyclable waste by type at Project site to the maximum extent practical according to approved <br />construction waste management plan. <br />1. Provide appropriately marked containers or bins for controlling recyclable waste until <br />removed from Project site. Include list of acceptable and unacceptable materials at each <br />container and bin. <br />a. Inspect containers and bins for contamination and remove contaminated materials <br />if found. <br />CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-5 <br />