Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 PLAN IMPLEMENTATION <br />A. General: Implement approved waste management plan. Provide handling, containers, storage, <br />signage, transportation, and other items as required to implement waste management plan <br />during the entire duration of the Contract. <br />1. Comply with operation, termination, and removal requirements in Section 015000 <br />"Temporary Facilities and Controls." <br />B. Waste Management Coordinator: Engage a waste management coordinator to be responsible <br />for implementing, monitoring, and reporting status of waste management work plan. <br />C. Training: Train workers, subcontractors, and suppliers on proper waste management <br />procedures, as appropriate for the Work. <br />1. Distribute waste management plan to everyone concerned within three days of submittal <br />return. <br />2. Distribute waste management plan to entities when they first begin work on -site. Review <br />plan procedures and locations established for salvage, recycling, and disposal. <br />D. Site Access and Temporary Controls: Conduct waste management operations to ensure <br />minimum interference with roads, streets, walks, walkways, and other adjacent occupied and <br />used facilities. <br />1. Designate and label specific areas on Project site necessary for separating materials that <br />are to be salvaged, recycled, reused, donated, and sold. <br />2. Comply with Section 015000 "Temporary Facilities and Controls" for controlling dust <br />and dirt, environmental protection, and noise control. <br />E. Waste Management in Historic Zones or Areas: Hauling equipment and other materials shall be <br />of sizes that clear surfaces within historic spaces, areas, rooms, and openings, by 12 inches (300 <br />mm) or more. <br />3.2 SALVAGING DEMOLITION WASTE <br />A. Salvaged Items for Reuse in the Work: Salvage items for reuse and handle as follows: <br />1. Clean salvaged items. <br />2. Pack or crate items after cleaning. Identify contents of containers with label indicating <br />elements, date of removal, quantity, and location where removed. <br />3. Store items in a secure area until installation. <br />4. Protect items from damage during transport and storage. <br />CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-4 <br />