Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />2. Do not hold waste materials more than seven days during normal weather or three days if <br />the temperature is expected to rise above 80 deg F (27 deg Q. <br />3. Containerize hazardous and unsanitary waste materials separately from other waste. <br />Mark containers appropriately and dispose of legally, according to regulations. <br />a. Use containers intended for holding waste materials of type to be stored. <br />B. Site: Maintain Project site free of waste materials and debris. <br />C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for <br />proper execution of the Work. <br />1. Remove liquid spills promptly. <br />2. Where dust would impair proper execution of the Work, broom -clean or vacuum the <br />entire work area, as appropriate. <br />D. Installed Work: Keep installed work clean. Clean installed surfaces according to written <br />instructions of manufacturer or fabricator of product installed, using only cleaning materials <br />specifically recommended. If specific cleaning materials are not recommended, use cleaning <br />materials that are not hazardous to health or property and that will not damage exposed surfaces. <br />E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space. <br />F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure <br />freedom from damage and deterioration at time of Substantial Completion. <br />G. Waste Disposal: Do not bury or burn waste materials on -site. Do not wash waste materials <br />down sewers or into waterways. Comply with waste disposal requirements in Section 017419 <br />"Construction Waste Management and Disposal." <br />H. During handling and installation, clean and protect construction in progress and adjoining <br />materials already in place. Apply protective covering where required to ensure protection from <br />damage or deterioration at Substantial Completion. <br />I. Clean and provide maintenance on completed construction as frequently as necessary through <br />the remainder of the construction period. Adjust and lubricate operable components to ensure <br />operability without damaging effects. <br />Limiting Exposures: Supervise construction operations to assure that no part of the <br />construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise <br />deleterious exposure during the construction period. <br />3.9 STARTING AND ADJUSTING <br />A. Coordinate startup and adjusting of equipment and operating components with requirements in <br />Section 019113 "General Commissioning Requirements." <br />B. Start equipment and operating components to confirm proper operation. Remove <br />malfunctioning units, replace with new units, and retest. <br />EXECUTION 017300-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.