Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish <br />restoration into retained adjoining construction in a manner that will minimize evidence <br />of patching and refinishing. <br />a. Clean piping, conduit, and similar features before applying paint or other finishing <br />materials. <br />b. Restore damaged pipe covering to its original condition. <br />Floors and Walls: Where walls or partitions that are removed extend one finished area <br />into another, patch and repair floor and wall surfaces in the new space. Provide an even <br />surface of uniform finish, color, texture, and appearance. Remove in -place floor and wall <br />coverings and replace with new materials, if necessary, to achieve uniform color and <br />appearance. <br />a. Where patching occurs in a painted surface, prepare substrate and apply primer and <br />intermediate paint coats appropriate for substrate over the patch, and apply final <br />paint coat over entire unbroken surface containing the patch. Provide additional <br />coats until patch blends with adjacent surfaces. <br />4. Ceilings: Patch, repair, or rehang in -place ceilings as necessary to provide an even -plane <br />surface of uniform appearance. <br />I. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, <br />mortar, oils, putty, and similar materials from adjacent finished surfaces. <br />3.7 OWNER- INSTALLED PRODUCTS <br />A. Site Access: Provide access to Project site for Owner's construction personnel. <br />B. Coordination: Coordinate construction and operations of the Work with work performed by <br />Owner's construction personnel. <br />1. Construction Schedule: Inform Owner of Contractor's preferred construction schedule <br />for Owner's portion of the Work. Adjust construction schedule based on a mutually <br />agreeable timetable. Notify Owner if changes to schedule are required due to differences <br />in actual construction progress. <br />2. Preinstallation Conferences: Include Owner's construction personnel at preinstallation <br />conferences covering portions of the Work that are to receive Owner's work. Attend <br />preinstallation conferences conducted by Owner's construction personnel if portions of <br />the Work depend on Owner's construction. <br />3.8 PROGRESS CLEANING <br />A. General: Clean Project site and work areas daily, including common areas. Enforce <br />requirements strictly. Dispose of materials lawfully. <br />Comply with requirements in NFPA 241 for removal of combustible waste materials and <br />debris. <br />EXECUTION 017300-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.