Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />2. Where space is limited, install components to maximize space available for maintenance <br />and ease of removal for replacement. <br />3. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated. <br />4. Maintain minimum headroom clearance of 96 inches (2440 mm) in occupied spaces and <br />90 inches (2300 mm) in unoccupied spaces. <br />B. Comply with manufacturer's written instructions and recommendations for installing products in <br />applications indicated. <br />C. Install products at the time and under conditions that will ensure the best possible results. <br />Maintain conditions required for product performance until Substantial Completion. <br />D. Conduct construction operations so no part of the Work is subjected to damaging operations or <br />loading in excess of that expected during normal conditions of occupancy. <br />E. Sequence the Work and allow adequate clearances to accommodate movement of construction <br />items on site and placement in permanent locations. <br />F. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels. <br />G. Templates: Obtain and distribute to the parties involved templates for work specified to be <br />factory prepared and field installed. Check Shop Drawings of other work to confirm that <br />adequate provisions are made for locating and installing products to comply with indicated <br />requirements. <br />H. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size <br />and number to securely anchor each component in place, accurately located and aligned with <br />other portions of the Work. Where size and type of attachments are not indicated, verify size <br />and type required for load conditions. <br />1. Mounting Heights: Where mounting heights are not indicated, mount components at <br />heights directed by Architect. <br />2. Allow for building movement, including thermal expansion and contraction. <br />3. Coordinate installation of anchorages. Furnish setting drawings, templates, and <br />directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and <br />items with integral anchors, that are to be embedded in concrete or masonry. Deliver <br />such items to Project site in time for installation. <br />I. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, <br />arrange joints for the best visual effect. Fit exposed connections together to form hairline joints. <br />Hazardous Materials: Use products, cleaners, and installation materials that are not considered <br />hazardous. <br />EXECUTION 017300-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.