Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />C. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for <br />clarification of the Contract Documents caused by differing field conditions outside the control <br />of Contractor, submit a request for information to Architect according to requirements in <br />Section 013100 "Project Management and Coordination." <br />3.3 CONSTRUCTION LAYOUT <br />A. Verification: Before proceeding to lay out the Work, verify layout information shown on <br />Drawings, in relation to the property survey and existing benchmarks. If discrepancies are <br />discovered, notify Architect promptly. <br />B. General: Engage a professional engineer to lay out the Work using accepted surveying <br />practices. <br />1. Establish benchmarks and control points to set lines and levels at each story of <br />construction and elsewhere as needed to locate each element of Project. <br />2. Establish limits on use of Project site. <br />3. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain <br />required dimensions. <br />4. Inform installers of lines and levels to which they must comply. <br />5. Check the location, level and plumb, of every major element as the Work progresses. <br />6. Notify Architect when deviations from required lines and levels exceed allowable <br />tolerances. <br />C. Record Log: Maintain a log of layout control work. Record deviations from required lines and <br />levels. Include beginning and ending dates and times of surveys, weather conditions, name and <br />duty of each survey party member, and types of instruments and tapes used. Make the log <br />available for reference by Architect. <br />3.4 FIELD ENGINEERING <br />A. Reference Points: Locate existing permanent benchmarks, control points, and similar reference <br />points before beginning the Work. Preserve and protect permanent benchmarks and control <br />points during construction operations. <br />1. Do not change or relocate existing benchmarks or control points without prior written <br />approval of Architect. Report lost or destroyed permanent benchmarks or control points <br />promptly. Report the need to relocate permanent benchmarks or control points to <br />Architect before proceeding. <br />2. Replace lost or destroyed permanent benchmarks and control points promptly. Base <br />replacements on the original survey control points. <br />3.5 INSTALLATION <br />A. General: Locate the Work and components of the Work accurately, in correct alignment and <br />elevation, as indicated. <br />1. Make vertical work plumb and make horizontal work level. <br />EXECUTION 017300-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.