Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />PART 2- PRODUCTS <br />2.1 MATERIALS <br />A. General: Comply with requirements specified in other Sections. <br />B. In -Place Materials: Use materials for patching identical to in -place materials. For exposed <br />surfaces, use materials that visually match in -place adjacent surfaces to the fullest extent <br />possible. <br />1. If identical materials are unavailable or cannot be used, use materials that, when installed, <br />will provide a match acceptable to Architect for the visual and functional performance of <br />in -place materials. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Existing Conditions: The existence and location of construction indicated as existing are not <br />guaranteed. Before beginning work, investigate and verify the existence and location <br />of mechanical and electrical systems, and other construction affecting the Work. <br />B. Examination and Acceptance of Conditions: Before proceeding with each component of the <br />Work, examine substrates, areas, and conditions, with Installer or Applicator present where <br />indicated, for compliance with requirements for installation tolerances and other conditions <br />affecting performance. Record observations. <br />1. Examine roughing -in for mechanical and electrical systems to verify actual locations of <br />connections before equipment and fixture installation. <br />2. Examine walls, floors, and roofs for suitable conditions where products and systems are <br />to be installed. <br />3. Verify compatibility with and suitability of substrates, including compatibility with <br />existing finishes or primers. <br />C. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding <br />with the Work indicates acceptance of surfaces and conditions. <br />3.2 PREPARATION <br />A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck <br />measurements before installing each product. Where portions of the Work are indicated to fit to <br />other construction, verify dimensions of other construction by field measurements before <br />fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the <br />Work. <br />B. Space Requirements: Verify space requirements and dimensions of items shown <br />diagrammatically on Drawings. <br />EXECUTION 017300-3 <br />