Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />SECTION 017300 - EXECUTION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes general administrative and procedural requirements governing execution of the <br />Work including, but not limited to, the following: <br />1. Construction layout. <br />2. Installation of the Work. <br />3. Cutting and patching. <br />4. Coordination of Owner- installed products. <br />5. Progress cleaning. <br />6. Starting and adjusting. <br />7. Protection of installed construction. <br />8. Correction of the Work. <br />B. Related Requirements: <br />1. Section 011000 "Summary" for limits on use of Project site. <br />2. Section 017700 "Closeout Procedures" for submitting final property survey with Project <br />Record Documents, recording of Owner - accepted deviations from indicated lines and <br />levels, and final cleaning. <br />3. Section 024119 "Selective Structure Demolition" for demolition and removal of selected <br />portions of the building. <br />4. Section 078413 "Penetration Firestopping" for patching penetrations in fire -rated <br />construction. <br />1.3 DEFINITIONS <br />A. Cutting: Removal of in -place construction necessary to permit installation or performance of <br />other work. <br />B. Patching: Fitting and repair work required to restore construction to original conditions after <br />installation of other work. <br />EXECUTION 017300-1 <br />