Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />2. Store materials in a manner that will not endanger Project structure. <br />3. Store products that are subject to damage by the elements, under cover in a weathertight <br />enclosure above ground, with ventilation adequate to prevent condensation. <br />4. Protect foam plastic from exposure to sunlight, except to extent necessary for period of <br />installation and concealment. <br />5. Comply with product manufacturer's written instructions for temperature, humidity, <br />ventilation, and weather - protection requirements for storage. <br />6. Protect stored products from damage and liquids from freezing. <br />7. Provide a secure location and enclosure at Project site for storage of materials and <br />equipment by Owner's construction forces. Coordinate location with Owner. <br />1.7 PRODUCT WARRANTIES <br />A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other <br />warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on <br />product warranties do not relieve Contractor of obligations under requirements of the Contract <br />Documents. <br />1. Manufacturer's Warranty: Written warranty furnished by individual manufacturer for a <br />particular product and specifically endorsed by manufacturer to Owner. <br />2. Special Warranty: Written warranty required by the Contract Documents to provide <br />specific rights for Owner. <br />B. Special Warranties: Prepare a written document that contains appropriate terms and <br />identification, ready for execution. <br />1. Manufacturer's Standard Form: Modified to include Project - specific information and <br />properly executed. <br />2. Specified Form: When specified forms are included with the Specifications, prepare a <br />written document using indicated form properly executed. <br />3. See other Sections for specific content requirements and particular requirements for <br />submitting special warranties. <br />C. Submittal Time: Comply with requirements in Section 017700 "Closeout Procedures." <br />PART 2- PRODUCTS <br />2.1 PRODUCT SELECTION PROCEDURES <br />A. General Product Requirements: Provide products that comply with the Contract Documents, <br />are undamaged and, unless otherwise indicated, are new at time of installation. <br />1. Provide products complete with accessories, trim, finish, fasteners, and other items <br />needed for a complete installation and indicated use and effect. <br />2. Standard Products: If available, and unless custom products or nonstandard options are <br />specified, provide standard products of types that have been produced and used <br />successfully in similar situations on other projects. <br />PRODUCT REQUIREMENTS 016000-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.