Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />A. Comparable Product Requests: Submit request for consideration of each comparable product. <br />Identify product or fabrication or installation method to be replaced. Include Specification <br />Section number and title and Drawing numbers and titles. <br />1. Include data to indicate compliance with the requirements specified in "Comparable <br />Products" Article. <br />2. Architect's Action: If necessary, Architect will request additional information or <br />documentation for evaluation within one week of receipt of a comparable product <br />request. Architect will notify Contractor of approval or rejection of proposed comparable <br />product request within 15 days of receipt of request, or seven days of receipt of additional <br />information or documentation, whichever is later. <br />a. Form of Approval: As specified in Section 013300 "Submittal Procedures." <br />b. Use product specified if Architect does not issue a decision on use of a comparable <br />product request within time allocated. <br />B. Basis -of- Design Product Specification Submittal: Comply with requirements in Section 013300 <br />"Submittal Procedures." Show compliance with requirements. <br />1.5 QUALITY ASSURANCE <br />A. Compatibility of Options: If Contractor is given option of selecting between two or more <br />products for use on Project, select product compatible with products previously selected, even if <br />previously selected products were also options. <br />1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING <br />A. Deliver, store, and handle products using means and methods that will prevent damage, <br />deterioration, and loss, including theft and vandalism. Comply with manufacturer's written <br />instructions. <br />B. Delivery and Handling: <br />1. Schedule delivery to minimize long -term storage at Project site and to prevent <br />overcrowding of construction spaces. <br />2. Coordinate delivery with installation time to ensure minimum holding time for items that <br />are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other <br />losses. <br />3. Deliver products to Project site in an undamaged condition in manufacturer's original <br />sealed container or other packaging system, complete with labels and instructions for <br />handling, storing, unpacking, protecting, and installing. <br />4. Inspect products on delivery to determine compliance with the Contract Documents and <br />to determine that products are undamaged and properly protected. <br />C. Storage: <br />Store products to allow for inspection and measurement of quantity or counting of units. <br />PRODUCT REQUIREMENTS 016000-2 <br />