Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />2. Maintain dust partitions during the Work. Use vacuum collection attachments on dust - <br />producing equipment. Isolate limited work within occupied areas using portable dust - <br />containment devices. <br />3. Perform daily construction cleanup and final cleanup using approved, HEPA- filter- <br />equipped vacuum equipment. <br />C. Ventilation and Humidity Control: Provide temporary ventilation required by construction <br />activities for curing or drying of completed installations or for protecting installed construction <br />from adverse effects of high humidity. Select equipment that will not have a harmful effect on <br />completed installations or elements being installed. Coordinate ventilation requirements to <br />produce ambient condition required and minimize energy consumption. <br />D. Lighting: Provide temporary lighting with local switching that provides adequate illumination <br />for construction operations, observations, inspections, and traffic conditions. <br />1. Install and operate temporary lighting that fulfills security and protection requirements <br />without operating entire system. <br />2. Install lighting for Project identification sign. <br />E. Electronic Communication Service: Provide a desktop computer in the primary field office <br />adequate for use by Architect and Owner to access Project electronic documents and maintain <br />electronic communications. <br />3.3 SUPPORT FACILITIES INSTALLATION <br />A. General: Comply with the following: <br />1. Provide construction for temporary offices, shops, and sheds located within construction <br />area or within 30 feet (9 m) of building lines that is noncombustible according to <br />ASTM E 136. Comply with NFPA 241. <br />2. Maintain support facilities until Architect schedules Substantial Completion inspection. <br />Remove before Substantial Completion. Personnel remaining after Substantial <br />Completion will be permitted to use permanent facilities, under conditions acceptable to <br />Owner. <br />B. Traffic Controls: Comply with requirements of authorities having jurisdiction. <br />1. Protect existing site improvements to remain including curbs, pavement, and utilities. <br />2. Maintain access for fire - fighting equipment and access to fire hydrants. <br />C. Parking: Provide temporary parking areas for construction personnel. <br />D. Project Signs: Provide Project signs as shown at the end of this specification section. <br />Unauthorized signs are not permitted. <br />E. Waste Disposal Facilities: Comply with requirements specified in Section 017419 <br />"Construction Waste Management and Disposal." <br />TEMPORARY FACILITIES AND CONTROLS 015000-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.