Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes requirements for temporary utilities, support facilities, and security and <br />protection facilities. <br />B. Related Requirements: <br />1. Section 011000 "Summary" for work restrictions and limitations on utility interruptions. <br />1.3 USE CHARGES <br />A. General: Installation and removal of and use charges for temporary facilities shall be included <br />in the Contract Sum unless otherwise indicated. Allow other entities to use temporary services <br />and facilities without cost, including, but not limited to, Owner's construction forces, Architect, <br />testing agencies, and authorities having jurisdiction. <br />1.4 INFORMATIONAL SUBMITTALS <br />A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for <br />construction personnel. <br />B. Fire- Safety Program: Show compliance with requirements of NFPA 241 and authorities having <br />jurisdiction. Indicate Contractor personnel responsible for management of fire- prevention <br />program. <br />C. Moisture- Protection Plan: Describe procedures and controls for protecting materials and <br />construction from water absorption and damage. <br />1. Describe delivery, handling, and storage provisions for materials subject to water <br />absorption or water damage. <br />2. Indicate procedures for discarding water- damaged materials, protocols for mitigating <br />water intrusion into completed Work, and replacing water- damaged Work. <br />3. Indicate sequencing of work that requires water, such as sprayed fire- resistive materials, <br />plastering, and terrazzo grinding, and describe plans for dealing with water from these <br />operations. Show procedures for verifying that wet construction has dried sufficiently to <br />permit installation of finish materials. <br />TEMPORARY FACILITIES AND CONTROLS 015000-1 <br />