Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />E. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's <br />responsibility, provide quality- control services, including retesting and reinspecting, for <br />construction that replaced Work that failed to comply with the Contract Documents. <br />F. Associated Services: Cooperate with agencies performing required tests, inspections, and <br />similar quality- control services, and provide reasonable auxiliary services as requested. Notify <br />agency sufficiently in advance of operations to permit assignment of personnel. Provide the <br />following: <br />1. Access to the Work. <br />2. Incidental labor and facilities necessary to facilitate tests and inspections. <br />3. Adequate quantities of representative samples of materials that require testing and <br />inspecting. Assist agency in obtaining samples. <br />4. Facilities for storage and field curing of test samples. <br />5. Preliminary design mix proposed for use for material mixes that require control by testing <br />agency. <br />6. Security and protection for samples and for testing and inspecting equipment at Project <br />site. <br />G. Coordination: Coordinate sequence of activities to accommodate required quality- assurance <br />and - control services with a minimum of delay and to avoid necessity of removing and <br />replacing construction to accommodate testing and inspecting. <br />Schedule times for tests, inspections, obtaining samples, and similar activities. <br />H. Schedule of Tests and Inspections: Prepare a schedule of tests, inspections, and similar quality - <br />control services required by the Contract Documents. Coordinate and submit concurrently with <br />Contractor's construction schedule. Update as the Work progresses. <br />I. Distribution: Distribute schedule to Owner, Architect, testing agencies, and each party <br />involved in performance of portions of the Work where tests and inspections are required. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 TEST AND INSPECTION LOG <br />A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following: <br />1. Date test or inspection was conducted. <br />2. Description of the Work tested or inspected. <br />3. Date test or inspection results were transmitted to Architect. <br />4. Identification of testing agency or special inspector conducting test or inspection. <br />B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test <br />and inspection log for Architect's reference during normal working hours. <br />QUALITY REQUIREMENTS 014000-7 <br />