Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />G. Manufacturer's Technical Representative Qualifications: An authorized representative of <br />manufacturer who is trained and approved by manufacturer to observe and inspect installation <br />of manufacturer's products that are similar in material, design, and extent to those indicated for <br />this Project. <br />H. Factory- Authorized Service Representative Qualifications: An authorized representative of <br />manufacturer who is trained and approved by manufacturer to inspect installation of <br />manufacturer's products that are similar in material, design, and extent to those indicated for this <br />Proj ect. <br />I. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing <br />for compliance with specified requirements for performance and test methods, comply with the <br />following: <br />Contractor responsibilities include the following: <br />a. Provide test specimens representative of proposed products and construction. <br />b. Submit specimens in a timely manner with sufficient time for testing and analyzing <br />results to prevent delaying the Work. <br />C. Provide sizes and configurations of test assemblies, mockups, and laboratory <br />mockups to adequately demonstrate capability of products to comply with <br />performance requirements. <br />d. Build site - assembled test assemblies and mockups using installers who will <br />perform same tasks for Project. <br />e. Build laboratory mockups at testing facility using personnel, products, and <br />methods of construction indicated for the completed Work. <br />£ When testing is complete, remove test specimens, assemblies, and mockups; do <br />not reuse products on Project. <br />2. Testing Agency Responsibilities: Submit a certified written report of each test, <br />inspection, and similar quality- assurance service to Architect, with copy to Contractor. <br />Interpret tests and inspections and state in each report whether tested and inspected work <br />complies with or deviates from the Contract Documents. <br />Mockups: Before installing portions of the Work requiring mockups, build mockups for each <br />form of construction and finish required to comply with the following requirements, using <br />materials indicated for the completed Work: <br />1. Build mockups in location and of size indicated or, if not indicated, as directed by <br />Architect. <br />2. Notify Architect seven days in advance of dates and times when mockups will be <br />constructed. <br />3. Employ supervisory personnel who will oversee mockup construction. Employ workers <br />that will be employed during the construction at Project. <br />4. Demonstrate the proposed range of aesthetic effects and workmanship. <br />5. Obtain Architect's approval of mockups before starting work, fabrication, or construction. <br />a. Allow seven days for initial review and each re- review of each mockup. <br />6. Maintain mockups during construction in an undisturbed condition as a standard for <br />judging the completed Work. <br />QUALITY REQUIREMENTS 014000-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.