Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />B. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to <br />demonstrate their capabilities and experience. Include proof of qualifications in the form of a <br />recent report on the inspection of the testing agency by a recognized authority. <br />C. Schedule of Tests and Inspections: Prepare in tabular form and include the following: <br />1. Specification Section number and title. <br />2. Entity responsible for performing tests and inspections. <br />3. Description of test and inspection. <br />4. Identification of applicable standards. <br />5. Identification of test and inspection methods. <br />6. Number of tests and inspections required. <br />7. Time schedule or time span for tests and inspections. <br />8. Requirements for obtaining samples. <br />9. Unique characteristics of each quality - control service. <br />1.6 REPORTS AND DOCUMENTS <br />A. Test and Inspection Reports: Prepare and submit certified written reports specified in other <br />Sections. Include the following: <br />1. Date of issue. <br />2. Project title and number. <br />3. Name, address, and telephone number of testing agency. <br />4. Dates and locations of samples and tests or inspections. <br />5. Names of individuals making tests and inspections. <br />6. Description of the Work and test and inspection method. <br />7. Identification of product and Specification Section. <br />8. Complete test or inspection data. <br />9. Test and inspection results and an interpretation of test results. <br />10. Record of temperature and weather conditions at time of sample taking and testing and <br />inspecting. <br />11. Comments or professional opinion on whether tested or inspected Work complies with <br />the Contract Document requirements. <br />12. Name and signature of laboratory inspector. <br />13. Recommendations on retesting and reinspecting. <br />B. Manufacturer's Technical Representative's Field Reports: Prepare written information <br />documenting manufacturer's technical representative's tests and inspections specified in other <br />Sections. Include the following: <br />1. Name, address, and telephone number of technical representative making report. <br />2. Statement on condition of substrates and their acceptability for installation of product. <br />3. Statement that products at Project site comply with requirements. <br />4. Summary of installation procedures being followed, whether they comply with <br />requirements and, if not, what corrective action was taken. <br />5. Results of operational and other tests and a statement of whether observed performance <br />complies with requirements. <br />6. Statement whether conditions, products, and installation will affect warranty. <br />7. Other required items indicated in individual Specification Sections. <br />QUALITY REQUIREMENTS 014000-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.