Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />B. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to <br />demonstrate their capabilities and experience. Include proof of qualifications in the form of a <br />recent report on the inspection of the testing agency by a recognized authority. <br />C. Schedule of Tests and Inspections: Prepare in tabular form and include the following: <br />1. Specification Section number and title. <br />2. Entity responsible for performing tests and inspections. <br />3. Description of test and inspection. <br />4. Identification of applicable standards. <br />5. Identification of test and inspection methods. <br />6. Number of tests and inspections required. <br />7. Time schedule or time span for tests and inspections. <br />8. Requirements for obtaining samples. <br />9. Unique characteristics of each quality - control service. <br />1.6 REPORTS AND DOCUMENTS <br />A. Test and Inspection Reports: Prepare and submit certified written reports specified in other <br />Sections. Include the following: <br />1. Date of issue. <br />2. Project title and number. <br />3. Name, address, and telephone number of testing agency. <br />4. Dates and locations of samples and tests or inspections. <br />5. Names of individuals making tests and inspections. <br />6. Description of the Work and test and inspection method. <br />7. Identification of product and Specification Section. <br />8. Complete test or inspection data. <br />9. Test and inspection results and an interpretation of test results. <br />10. Record of temperature and weather conditions at time of sample taking and testing and <br />inspecting. <br />11. Comments or professional opinion on whether tested or inspected Work complies with <br />the Contract Document requirements. <br />12. Name and signature of laboratory inspector. <br />13. Recommendations on retesting and reinspecting. <br />B. Manufacturer's Technical Representative's Field Reports: Prepare written information <br />documenting manufacturer's technical representative's tests and inspections specified in other <br />Sections. Include the following: <br />1. Name, address, and telephone number of technical representative making report. <br />2. Statement on condition of substrates and their acceptability for installation of product. <br />3. Statement that products at Project site comply with requirements. <br />4. Summary of installation procedures being followed, whether they comply with <br />requirements and, if not, what corrective action was taken. <br />5. Results of operational and other tests and a statement of whether observed performance <br />complies with requirements. <br />6. Statement whether conditions, products, and installation will affect warranty. <br />7. Other required items indicated in individual Specification Sections. <br />QUALITY REQUIREMENTS 014000-3 <br />