Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />PART 2- PRODUCTS <br />2.1 SUBMITTAL PROCEDURES <br />A. General Submittal Procedure Requirements: Prepare and submit submittals required by <br />individual Specification Sections. Types of submittals are indicated in individual Specification <br />Sections. <br />1. Action Submittals: Submit six paper copies of each submittal unless otherwise indicated. <br />Architect will return three copies. <br />2. Informational Submittals: Submit three paper copies of each submittal unless otherwise <br />indicated. Architect will not return copies. <br />3. Certificates and Certifications Submittals: Provide a statement that includes signature of <br />entity responsible for preparing certification. Certificates and certifications shall be <br />signed by an officer or other individual authorized to sign documents on behalf of that <br />entity. <br />a. Provide a notarized statement on original paper copy certificates and certifications <br />where indicated. <br />B. Product Data: Collect information into a single submittal for each element of construction and <br />type of product or equipment. <br />1. If information must be specially prepared for submittal because standard published data <br />are not suitable for use, submit as Shop Drawings, not as Product Data. <br />2. Mark each copy of each submittal to show which products and options are applicable. <br />3. Include the following information, as applicable: <br />a. Manufacturer's catalog cuts. <br />b. Manufacturer's product specifications. <br />C. Standard color charts. <br />d. Statement of compliance with specified referenced standards. <br />e. Testing by recognized testing agency. <br />f. Application of testing agency labels and seals. <br />g. Notation of coordination requirements. <br />h. Availability and delivery time information. <br />4. For equipment, include the following in addition to the above, as applicable: <br />a. Wiring diagrams showing factory- installed wiring. <br />b. Printed performance curves. <br />C. Operational range diagrams. <br />d. Clearances required to other construction, if not indicated on accompanying Shop <br />Drawings. <br />5. Submit Product Data before or concurrent with Samples. <br />6. Submit Product Data in the following format: <br />a. Six paper copies of Product Data unless otherwise indicated. Architect will return <br />three copies. <br />SUBMITTAL PROCEDURES 013300-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.