Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />12. Emergency procedures. <br />13. Orders and requests of authorities having jurisdiction. <br />14. Change Orders received and implemented. <br />15. Construction Change Directives received and implemented. <br />16. Services connected and disconnected. <br />17. Equipment or system tests and startups. <br />18. Partial completions and occupancies. <br />19. Substantial Completions authorized. <br />B. Site Condition Reports: Immediately on discovery of a difference between site conditions and <br />the Contract Documents, prepare and submit a detailed report. Submit with a Request for <br />Information. Include a detailed description of the differing conditions, together with <br />recommendations for changing the Contract Documents. <br />2.5 SPECIAL REPORTS <br />A. Reporting Unusual Events: When an event of an unusual and significant nature occurs at <br />Project site, whether or not related directly to the Work, prepare and submit a special report. <br />List chain of events, persons participating, response by Contractor's personnel, evaluation of <br />results or effects, and similar pertinent information. Advise Owner in advance when these <br />events are known or predictable. <br />PART 3 - EXECUTION <br />3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE <br />A. Contractor's Construction Schedule Updating: At biweekly intervals, update schedule to reflect <br />actual construction progress and activities. Issue schedule two working days before each <br />regularly scheduled progress meeting. <br />1. Revise schedule immediately after each meeting or other activity where revisions have <br />been recognized or made. Issue updated schedule concurrently with the report of each <br />such meeting. <br />2. Include a report with updated schedule that indicates every change, including, but not <br />limited to, changes in logic, durations, actual starts and finishes, and activity durations. <br />3. As the Work progresses, indicate final completion percentage for each activity. <br />B. Distribution: Distribute copies of approved schedule to Architect Owner, separate contractors, <br />testing and inspecting agencies, and other parties identified by Contractor with a need -to -know <br />schedule responsibility. <br />1. Post copies in Project meeting rooms and temporary field offices. <br />2. When revisions are made, distribute updated schedules to the same parties and post in the <br />same locations. Delete parties from distribution when they have completed their assigned <br />portion of the Work and are no longer involved in performance of construction activities. <br />END OF SECTION 013200 <br />CONSTRUCTION PROGRESS DOCUMENTATION 013200-8 <br />