Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />6. Early and late finish dates. <br />7. Activity duration in workdays. <br />8. Total float or slack time. <br />9. Average size of workforce. <br />10. Dollar value of activity (coordinated with the schedule of values). <br />G. Schedule Updating: Concurrent with making revisions to schedule, prepare tabulated reports <br />showing the following: <br />1. Identification of activities that have changed. <br />2. Changes in early and late start dates. <br />3. Changes in early and late finish dates. <br />4. Changes in activity durations in workdays. <br />5. Changes in the critical path. <br />6. Changes in total float or slack time. <br />7. Changes in the Contract Time. <br />H. Value Summaries: Prepare two cumulative value lists, sorted by finish dates. <br />I . In first list, tabulate activity number, early finish date, dollar value, and cumulative dollar <br />value. <br />2. In second list, tabulate activity number, late finish date, dollar value, and cumulative <br />dollar value. <br />3. In subsequent issues of both lists, substitute actual finish dates for activities completed as <br />of list date. <br />4. Prepare list for ease of comparison with payment requests; coordinate timing with <br />progress meetings. <br />a. In both value summary lists, tabulate "actual percent complete" and "cumulative <br />value completed" with total at bottom. <br />b. Submit value summary printouts two working days before each regularly <br />scheduled progress meeting. <br />2.4 REPORTS <br />A. Daily Construction Reports: Prepare a daily construction report recording the following <br />information concerning events at Project site: <br />1. List of subcontractors at Project site. <br />2. List of separate contractors at Project site. <br />3. Approximate count of personnel at Project site. <br />4. Equipment at Project site. <br />5. Material deliveries. <br />6. High and low temperatures and general weather conditions, including presence of rain or <br />snow. <br />7. Accidents. <br />8. Meetings and significant decisions. <br />9. Unusual events (see special reports). <br />10. Stoppages, delays, shortages, and losses. <br />11. Meter readings and similar recordings. <br />CONSTRUCTION PROGRESS DOCUMENTATION 013200-7 <br />