Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />4. Work Restrictions: Show the effect of the following items on the schedule: <br />a. Coordination with existing construction. <br />b. Limitations of continued occupancies. <br />C. Uninterruptible services. <br />d. Use of premises restrictions. <br />e. Provisions for future construction. <br />f. Environmental control. <br />5. Work Stages: Indicate important stages of construction for each major portion of the <br />Work, including, but not limited to, the following: <br />a. Subcontract awards. <br />b. Submittals. <br />C. Purchases. <br />d. Mockups. <br />e. Fabrication. <br />f. Sample testing. <br />g. Deliveries. <br />h. Installation. <br />i. Tests and inspections. <br />j. Adjusting. <br />k. Curing. <br />1. Startup and placement into final use and operation. <br />6. Construction Areas: Identify each major area of construction for each major portion of <br />the Work. Indicate where each construction activity within a major area must be <br />sequenced or integrated with other construction activities to provide for the following: <br />a. Structural completion. <br />b. Completion of mechanical installation. <br />C. Completion of electrical installation. <br />d. Substantial Completion. <br />D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but <br />not limited to, the Notice to Proceed, Substantial Completion, and final completion, and the <br />following interim milestones: <br />1. Completion of selective demolition operations in Building A. <br />2. Completion of Phase 1, renovations in Building A. <br />3. Completion of selective demolition operations in Building B. <br />E. Cost Correlation: Superimpose a cost correlation timeline, indicating planned and actual costs. <br />On the line, show planned and actual dollar volume of the Work performed as of planned and <br />actual dates used for preparation of payment requests. <br />See Section 012900 "Payment Procedures" for cost reporting and payment procedures. <br />CONSTRUCTION PROGRESS DOCUMENTATION 013200-4 <br />