DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />I. Special Reports: Submit at time of unusual event. <br />1.5 COORDINATION <br />A. Coordinate Contractor's construction schedule with the schedule of values, submittal schedule, <br />progress reports, payment requests, and other required schedules and reports. <br />1. Secure time commitments for performing critical elements of the Work from entities <br />involved. <br />2. Coordinate each construction activity in the network with other activities and schedule <br />them in proper sequence. <br />PART2- PRODUCTS <br />2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL <br />A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Final <br />Acceptance. <br />Contract completion date shall not be changed by submission of a schedule that shows an <br />early completion date, unless specifically authorized by Change Order. <br />B. Activities: Treat each story or separate area as a separate numbered activity for each main <br />element of the Work. Comply with the following: <br />1. Activity Duration: Define activities so no activity is longer than 20 days, unless <br />specifically allowed by Architect. <br />2. Procurement Activities: Include procurement process activities for the following long <br />lead items and major items, requiring a cycle of more than 60 days, as separate activities <br />in schedule. Procurement cycle activities include, but are not limited to, submittals, <br />approvals, purchasing, fabrication, and delivery. <br />3. Submittal Review Time: Include review and resubmittal times indicated in <br />Section 013300 "Submittal Procedures" in schedule. Coordinate submittal review times <br />in Contractor's construction schedule with submittal schedule. <br />4. Startup and Testing Time: Include no fewer than 15 days for startup and testing. <br />5. Substantial Completion: Indicate completion in advance of date established for <br />Substantial Completion, and allow time for Architect's administrative procedures <br />necessary for certification of Substantial Completion. <br />C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and <br />as follows in schedule, and show how the sequence of the Work is affected. <br />1. Phasing: Arrange list of activities on schedule by phase. <br />2. Work by Owner: Include a separate activity for each portion of the Work performed by <br />Owner. <br />Owner- Furnished Products: Include a separate activity for each product. Include <br />delivery date indicated in Section 011000 "Summary." Delivery dates indicated stipulate <br />the earliest possible delivery date. <br />CONSTRUCTION PROGRESS DOCUMENTATION 013200-3 <br />