Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />SECTION 0 13 100 - PROJECT MANAGEMENT AND COORDINATION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative provisions for coordinating construction operations on Project <br />including, but not limited to, the following: <br />1. General coordination procedures. <br />2. Requests for Information (RFIs). <br />3. Project meetings. <br />B. Related Requirements: <br />1. Section 013200 "Construction Progress Documentation" for preparing and submitting <br />Contractor's construction schedule. <br />2. Section 017300 "Execution" for procedures for coordinating general installation and <br />field - engineering services, including establishment of benchmarks and control points. <br />3. Section 017700 "Closeout Procedures" for coordinating closeout of the Contract. <br />1.3 DEFINITIONS <br />A. RFI: Request from Owner, Architect, or Contractor seeking information required by or <br />clarifications of the Contract Documents. <br />1.4 INFORMATIONAL SUBMITTALS <br />A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each <br />portion of the Work, including those who are to furnish products or equipment fabricated to a <br />special design. Include the following information in tabular form: <br />1. Name, address, and telephone number of entity performing subcontract or supplying <br />products. <br />2. Number and title of related Specification Section(s) covered by subcontract. <br />3. Drawing number and detail references, as appropriate, covered by subcontract. <br />B. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key <br />personnel assignments, including superintendent and other personnel in attendance at Project <br />site. Identify individuals and their duties and responsibilities; list addresses and telephone <br />numbers, including home, office, and cellular telephone numbers and e-mail addresses. Provide <br />PROJECT MANAGEMENT AND COORDINATION 013100-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.