Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or <br />others unless permitted under the following conditions and then only after providing temporary <br />utility services according to requirements indicated: <br />1. Notify Architect not less than two days in advance of proposed utility interruptions. <br />2. Obtain Architect's written permission before proceeding with utility interruptions. <br />D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and <br />vibration, odors, or other disruption to Owner occupancy with Owner. <br />1. Notify Architect not less than two days in advance of proposed disruptive operations. <br />2. Obtain Architect's written permission before proceeding with disruptive operations. <br />E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of <br />entrances, operable windows, or outdoor -air intakes. <br />F. Controlled Substances: Use of tobacco products and other controlled substances on Project site <br />is not permitted. <br />G. Employee Identification: Provide identification tags for Contractor personnel working on <br />Project site. Require personnel to use identification tags at all times. <br />H. Employee Screening: Comply with Owner's requirements for drug and background screening <br />of Contractor personnel working on Project site. <br />Maintain list of approved screened personnel with Owner's representative. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION 011000 <br />SUMMARY 011000-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.