Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />The owner will: <br />a. Attend the scheduled prebid conference. <br />b. Identify or determine those work areas of a contract where MBEs may have an <br />interest in performing contract work. <br />C. At least ten (10) days prior to the scheduled day of bid opening, the Owner will <br />notify certified MBEs of potential contracting opportunities listed in the proposal. <br />The notification will include the following: <br />1. A description of the work for which the bid is being solicited. <br />2. The date, time and location where bids are to be submitted. <br />3. The name of the individual within the agency /institution who will be <br />available to answer questions about the project. <br />4. Where bid documents may be reviewed. <br />5. Any special requirements that may exist, such as insurance, licenses, <br />bonds and financial arrangements. <br />If there are more than three (3) certified MBEs in the general locality of the project who <br />offer similar contracting or subcontracting services in the specific trade, the Owner shall <br />notify three (3) , but may contact more, if the Owner so desires. <br />d. Maintain documentation of any contacts, correspondence, or conversations with <br />MBE firms made in an attempt to meet the goals. <br />2. Prime Contractor <br />Under the single prime contract system, the prime contractor will_: <br />a. Attend the scheduled prebid conference. <br />b. Identify or determine those work areas of a contract where MBEs may have an <br />interest in performing contract work. <br />C. At least ten (10) days prior to the scheduled day of bid opening, notify certified <br />MBEs of potential contracting opportunities listed in the proposal. The <br />notification will include the following: <br />1. A description of the work for which the bid is being solicited. <br />2. The date, time and location where bids are to be submitted. <br />3. The name of the individual within the agency /institution who will be <br />available to answer questions about the project. <br />4. Where bid documents may be reviewed. <br />5. Any special requirements that may exist, such as insurance, licenses, <br />bonds and financial arrangements. <br />If there are more than three (3) certified MBEs in the general locality of the project who <br />offer similar contracting or subcontracting services in the specific trade, the Contractor <br />shall notify three (3) , but may contact more, if the Contractor so desires. <br />d. During the bidding process, comply with the contractor(s) requirements listed in <br />the proposal for minority participation. <br />e. Submit with the bid a description of that portion of the work to be executed by <br />MBEs expressed as a percentage of the total price. <br />f. Identify the MBEs the bidder intends to use on the contract, along with the dollar <br />amount of the work to be performed by each minority business. <br />g. Submit an affidavit that details the good faith efforts taken to procure minority <br />business participation. <br />h. Upon being named the apparent low bidder, the bidder shall provide the necessary <br />
The URL can be used to link to this page
Your browser does not support the video tag.