Orange County NC Website
FROM :ERCD <br />FRX N0, :9196443351 <br />Sep. 05 2006 09:14RM P4 <br />0 <br />on the master plan, as per the Committee's charge. Tt is our <br />understanding the exact location of these future activities will <br />be addressed at a subsequent time.. <br />Master Plan iZationale <br />As the master plan design unfolded, the Committee became aware that the <br />majority of the proposed activity would need to be located in two "pods" of the <br />park.. This was made apparent by the uncertainty surrounding use of the former <br />landfilled areas and the existing plans for the County and municipal future uses <br />on the eastern part (eastern pod) of the site. Therefore, the facilities ware <br />designed to avoid these areas, work around the existing stream buffer, and try to <br />protect as much of the mature hardwood forost in the southern part of the site as <br />possible.. <br />However, the remaining best usable land was largely locate the "southern <br />pad" near the hardwoods area. The master plan sites most, the facilities of the <br />park in this area„yv~tileYpi~~FNggiA bt4gktio#"~la h~?~w'otid`st~-7 he design attempts <br />to keep as much of this area intact as possible, and sites only a picnic shelter <br />and playground (which can be nestled among the trees): The larger facilities are <br />located to the north and west of the best part of the hardwoods. Specimen trees <br />of large caliper or age were also protected. The retention of this forested area will <br />also serve as a buffer for residents along 7orain Street, The Town of <br />Hillsborough plans to construct a 10,000 to 12,000 square foot Public <br />bNvrkslMotor Poo! facility on its designated site {generally the southwest corner <br />of the County Public ~Norks property, which would be transferred to the Town) <br />Also to be included on the site is 7,000 to £3,000 square feet of covered storage <br />facilities, The Town plans to locate its facikHies on the western portion of the site <br />with the intent to leave enough acreage for potential future expansion. <br />T'he second pod of activity is smaller and would be located near the existing <br />Hillsborough Community Policing Station. The group recognized that there is an <br />arbor and history of using Phis area, termed the "western pod", as a gathering <br />spot, and while the available or usable land is limited, some facilities would be <br />retained here. These facilities are also easily accessed from Rainey Avenue., <br />To facilitate greater accessibili€y between the two pods of park activity, a <br />connector trail is proposed that offers a direct way of moving from the "western <br />pad" (police station;picnicfplaygrvund area) to the "southern pod" (ballfield and <br />other facilities). This 1000-font trail also ai[ows parsons entering the park from <br />either Torain Street or Rainey Avenue to access the other portion of the park In <br />addition to this trail, trails around the ballfiield and a connector trail to the <br />intersection of Rainey and Homemont Avenue are also reflected. Thus, <br />pedestrians could enter the park from Rainey Avenue, 1"orain Street or <br />Homemont Avenue, as well as from other intersections with Rainey Avenue. <br />_Q~, <br />fir. <br />