Browse
Search
Agenda - 09-12-2006-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 09-12-2006
>
Agenda - 09-12-2006-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 5:08:22 AM
Creation date
8/29/2008 9:46:30 AM
Metadata
Fields
Template:
BOCC
Date
9/12/2006
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20060912
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: (August 22, 2006 <br />~,/ <br />Action Agent~a <br />Item No. `-~ b <br />SUBJECT: County-Funded Sustainable Design Elements for Community College Campus <br />DEPARTMENT: Purchasing and Central <br />Services & Planning <br />Department <br />PUBLIC HEARING: (YIN) No <br />ATTACHMENT (S): <br />CRZ Letter <br />INFORMATION CONTACT: <br />Pam Janes, (919) 245-2652 <br />Craig Benedict, (919) 245-2590 <br />Karen Lincoln, (919) 245-2594 <br />PURPOSE: To consider authorizing the expenditure of funds for sustainable design elements <br />in the Durham Technical Community College (DTCC), Satellite Campus Building One, <br />BACKGROUND: In November 2005, the Board was presented with a list of sustainable design <br />elements that could be included in the first building under design for the DTCC Satellite <br />Campus in Orange County. <br />Based on bids for the project received on June 29, 2006, Corley Redfoot Zack (CRZ), the <br />project architect, has provided life cycle cost information on the attached letter and summarized <br />below: <br />Alternate Sustainable Desi n Element Life-C cle Cost Pa back <br />Alternate #2 Aluminum Li ht Shelves Over 40 ears <br />Alternate #3 Photovoltaic Arra Over 40 ears <br />Alternate #4 Domestic Water Solar S stem Over 50 ears <br />Alternate #5 Rainwater Collection S stem Over 100 Years <br />Alternate #6 Waterless Urinals Less than 5 ears <br />Alternate #7 O erable Windows Not calculated <br />Alternate #8 125-Vehicle Park and Ride <br />Lot <br />* Life Cycle Cost (LCC) calculations are based on current rates and capacity of utilities. As <br />supplies diminish, it is assumed that market adjustments will be made accordingly, The <br />degree of modification will certainly effect the payback period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.