Browse
Search
Agenda - 09-12-2006-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 09-12-2006
>
Agenda - 09-12-2006-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 5:08:22 AM
Creation date
8/29/2008 9:46:30 AM
Metadata
Fields
Template:
BOCC
Date
9/12/2006
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20060912
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: September 12, 2006 <br />Action Agenda <br />Item No. ~••q <br />SUBJECT: County-Funded Sustainable Design Elements for Community College Campus <br />Building <br />DEPARTMENT: Purchasing and Central PUBLIC HEARING: (Y/N) No <br />Services & Planning <br />Department <br />ATTACHMENT (S): <br />August 22, 2006 Abstract <br />MLB Cost Quote for Parking Lot <br />Alternates <br />INFORMATION CONTACT: <br />Pam Janes, (919) 245-2652 <br />Craiq Benedict, (919) 245-2590 <br />Karen Lincoln, (919) 245-2594 <br />PURPOSE: To consider authorizing the expenditure of funds for sustainable design elements <br />for the Durham Technical Community College (DTCC), Satellite Campus Building One, <br />BACKGROUND: At the August 22, 2006 Commissioners meeting, the Board received <br />information regarding the bid amounts and life cycle cost payback of sustainable design <br />elements that have been bid far the DTCC campus building, Additional information regarding <br />the affordability of these elements was included in the information discussed during the August <br />31, 2006 worksession, DTCC has already signed contracts with MLB Construction Company, <br />the low bidder for the project, However, the specifications required that the contractor hold <br />pricing for the alternates for 90-days past the .tune 29 bid opening in order far the <br />Commissioners to determine which elements should be funded and subsequently be <br />incorporated into the construction contract. <br />As a reminder, the sustainable design elements, with the bid amount and associated life cycle <br />cast payback are as follows: <br />Alternate Sustainable Design Life-Cycle Cost Bid Amount <br /> Element Pa back <br />Alternate Aluminum Light Shelves Over 40 years $124,000 <br />#2 <br />Alternate Photovoltaic Array Over 40 years $ 16,800 <br />#3 <br />Alternate Domestic Water Solar Over 50 years $ 35,600 ', <br />#4 S stem <br />
The URL can be used to link to this page
Your browser does not support the video tag.