Browse
Search
Agenda - 08-31-2006-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 08-31-2006
>
Agenda - 08-31-2006-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 9:00:31 AM
Creation date
8/29/2008 9:44:19 AM
Metadata
Fields
Template:
BOCC
Date
8/31/2006
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20060831
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SL2006 -0232 Page .3 or 5 <br />L%J 1111. r.111VU11. LL,`, N VL l v Lieu uvaa a aaau.a v. -- 1 — <br />contractors. The prequalification criteria if any, shall be determined the <br />local board of education and the private developer to address quali <br />performance the time specified in the bids for performance of the contract the <br />cost of construction oversight, time for completion, capacity to perform, and <br />L2 <br />Llll..a,...l ....ua...,.., L <br />The local board of education shall require the private developer to submit its <br />plan for compliance with G.S. 143 -128.2 for approval by the local board of <br />education prior to the private developer soliciting bids under this subsection. <br />A private developer or its construction manager at risk shall publicly advertise <br />at least 30 days m advance of the bid date m a newspaper having General <br />circulation within the eeoaraphic areas served by the local board of education <br />shall open bids publicly and shall award each contract to the lowest <br />responsible, responsive and pregualified bidder taking into consideration <br />quali erformance, the time specified in the bids for performance of the <br />contract the cost of construction oversight time for completion, compliance <br />with G S 143 -128.2 and any other factors deemed appropriate by the private <br />developer and the local board of education and included m the bid solicitation. <br />A private developer or its construction manager at risk shall enter into the <br />construction contracts directly with the successful bidder. After the award of a <br />contract or contracts, the private developer or its construction manager at risk <br />and any contractor ma negotiate and <br />reach <br />agreement with the successful <br />bidder <br />on modifications to all aspects of the contract including the time for <br />performance, the scope of the wor c, and the price to be paid. <br />The local board of education in its discretion may require the private <br />http: / /www.ncleg,net/Sessions/ 2005 /Bills /Senate/HTML /S2009v4.html 8/21/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.