Orange County NC Website
e <br />5. Revise proposed use to reflect L) DO code language "Solar Array- Public Utility, "' <br />, Recommend that you consider adding a landscape plan to better address the below <br />comments. <br />7. Please consolidate the notes and clarify the Type D Land Use Puffer on the site <br />plan. Please provide Staff with a detailed drawing /rendering of a typical 100 ft_ <br />section of the buffer. For every 100 ft, mote the number of plants to be planted per <br />the landscape requirements for the Type D Land Use Puffer, Also note that the <br />typical sections is to be applied where existing vegetation is removed or is <br />insufficient to meet the stated Type D buffer rate. Also label areas outside the <br />buffer that are to remain undisturbed. <br />8. Revise note 6 to also indicate species will be native, non - invasive and drought <br />tolerant. <br />9. Provide a general Gst or range of proposed landscape materials and consolidate <br />into a plank list - <br />10. Add notes and labels regarding existing vegetation throughout the site with species, <br />height and caliper size (measured at DI3H) ranges. <br />11, Indicate your limits of disturbance and tree save areas. <br />12. Provide a detail and/or cross section of the access easement and interior utility <br />drives. <br />13. Please demarcate the floodplain with appropriate buffers on the site plan with a <br />pattern or notation. Please do likewise with streams, <br />14_ Provide a legend on plans to make it clearer what symbology and hatches <br />represent. <br />15, There are several boxes without text and leaders to what may be the lease limits. <br />16. Please be advised and acknowledge on the plan that the SUP applies to the entire <br />parcel and not just the leased area. <br />17. Please label and note dimensions on all driveways throughout the solar array area. <br />18. Record and reference the access easement on the frontage lot, <br />19. Indicate that access easement will be free and clear of any structures and/or <br />obstructions. <br />20. Please also label and note the dimensions of the access easement leading to the <br />site. <br />21. The current site plan shows that the easerent leads into a driveway without <br />change in dimension. This implies the POP for the utility vehicles is 50' or that you <br />have these interior drives within easements_ <br />22. Please also reference the book and page number of the recorded easement. <br />23. Consider having one version of the plan with an ortho -photo and one without. This <br />may make the plans easier to read and fallow. <br />24. Please identify the outlined boxes (3) with lines connected from the edges of the <br />solar array area to the boxes. <br />25. Please show more clearly the Parcel Identification Numbers {PINS} on the subject <br />areas to make clear distinction between the parcel with the proposed solar arrays <br />and the parcel from which an easement will be established. <br />6. Please ensure that the PIN is 9835 -02 -9137 (some of these numbers have been <br />transposed so that the PIN is inaccurate in some cases) can all application materials <br />and reference easement. <br />