Browse
Search
Agenda - 02-06-2018 5-a - Class A Special Use Permit – Solar Array off US Highway 70 in Cheeks Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 02-06-2018 Regular Meeting
>
Agenda - 02-06-2018 5-a - Class A Special Use Permit – Solar Array off US Highway 70 in Cheeks Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:59:59 AM
Creation date
2/2/2018 11:01:01 AM
Metadata
Fields
Template:
BOCC
Document Relationships
Agenda - 02-06-2018 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 02-06-2018 Regular Meeting
Minutes 02-06-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
159 <br />DIUVEWAY PERM1l`lf' SPECIAL PROVISIONS <br />I. A copy of the permit and the approved plans stamped by NCDOT will be on the site and <br />vgilable for inspection by NCDOT personnel while in construction is on progress. if safety <br />or traffic conditions warrant such an action, NCDOT reserves the right to strap all work <br />unless evidence of approval unrk he shown. <br />It will be nceessary for you or your contractor to notify Mr. DeA.ngelo .Jones, Assistant <br />District Engineer, upon receipt of this letter to schedule a mandatory Preconstruction <br />Conference, to provide your anticipated date of starting or to review any plan revisions <br />made by the District Office prior to construetiois beginning on this permit. Mr. Jones <br />can be reached at (336) 5701 -6833 between the hours of 8 :00 a.m. and 5 :00 p.m. Monday <br />through Friday.. <br />3. When working within NCDOT right of way, District Personnel, Shawn Smith, shall be <br />notified hventy- four (24) hours in advance at telephone number (336) 570 -6833 for <br />inspection at each of the rollawing phases: (A) Drainage, (Ii) Grading, (C) Placement of <br />base, (D) Paving, (C) Seeding. <br />4. When the work has been completed, please notify i1r'ir. Jones by letter at P.O. Box 766, <br />Graham, North Carolina 27253 -0766 in order that a final inspection can be made. <br />WORK ZONE TRAFFIC CONTROL QUALIiFICATIONS AND TRAINING <br />PROGRAM- Effective July 1, 2010, all flagging operations within I+ICDCYr Fight of Way <br />required qualified and trained Work Zone F1agf ers. Effective July 1, 2011, qualified and <br />trained Work Zane Traffic Control Supervisors will be required on Significant Projects. <br />Training for this certification will be provided by l'dO:DOT approved training sources and/or <br />private entities that Dave been prc approve d to train thennscives, if you have questions, visit <br />our 'web site at %vww.ncdot.oreldoh /preCGnst_ ruction / %vztc/wztetrainiggRi- gani /d fault htpnl or <br />contact Stuart Bourne, 1I.E. with NCDOT Work Zone Traffic Control Unit at (919) 250-4159 <br />or sbourgi3Oa ncdot.gov. <br />& That the party of the second part agrees to provide: traffic Control devices, lane closures, road <br />closures, positive protection and/or any ether warning or positive protection devices <br />necessary for the safety of road users during construction and any subsequent maintenance. <br />This shall be performed in conformance with the latest NCDo,r Roadway 'Standard <br />P- i.oa_and_ Standard Specifications for Road and Structures and Amendments or <br />Supplements thereto. When there is no ,guidance provided in Roadway Standard Drawings <br />or Specifications, comply with the Manual on Uctif_ um Traffic Control Devices for Streets <br />and Ifighway and Amendment. or Supplement thereto, Information as to the above rules and <br />regulations may be obtained from the Division Engineer of the party of the first part. <br />7. Work requiring lane closure or restrictions will not be allowed between 7.00 arm — 9.00 <br />am and 4:00 p.m, — 7:00 p.nr. Monday through Friday uariess othernvice curetted by the <br />District Enf ineer or as shown ost the approved [)lams. <br />8. At, least one lane of traffic shall remain open at all times. <br />9. Any work requiring equipment or personnel within 5° of the edge of any travel lane shall <br />require a Rine: closure with appropriate taperg. <br />
The URL can be used to link to this page
Your browser does not support the video tag.