Browse
Search
Agenda - 02-06-2018 5-a - Class A Special Use Permit – Solar Array off US Highway 70 in Cheeks Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 02-06-2018 Regular Meeting
>
Agenda - 02-06-2018 5-a - Class A Special Use Permit – Solar Array off US Highway 70 in Cheeks Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:59:59 AM
Creation date
2/2/2018 11:01:01 AM
Metadata
Fields
Template:
BOCC
Document Relationships
Agenda - 02-06-2018 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 02-06-2018 Regular Meeting
Minutes 02-06-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kim ley» )Horn <br />MEMORANDUM <br />To; Kyle Campbell. ESA Ri�oewables <br />From: Travis Pluitt, P.E. <br />Iimley -Horn and Associates, Inc. <br />Date: April 26, 2016 <br />Subject: Oakwood Solar Farm — Trip Generation <br />128 <br />KIMLEY -HORN AND ASSOCIATES, INC <br />HC license W -0102 <br />�ry..wi�wwaa. <br />Qdi�3 y by: <br />•�4��sl��ws <br />Kimlay -Horn has reviewed the trip generatic+i potenlial of the proposed Oakwood solar farm located <br />on US 70 in Mebane, NC. The ITE Trip Generation Manual does nut provide trip generation rates for <br />solar farms. Therefore, The trip generation was estimated Fused on the anticipated number of <br />employees both during construction and a full bulld�ut. <br />I)turing construction it is estimated that a maximum of 40 workers will be on site each day. Though <br />some workers will carpool, as a worst case it is assumed that all workers arrive individually in the Aft <br />peak hour and depart individually in the PM pear hour_ There are also anticipated to be <br />approximately B truck deliveries per day during construction with only 1 vehicle on -site at any given <br />lime. As a worst case, it Is assumed that 2 trucks enter and exit during each peak hour. Therefore, it <br />is anticipated that in a worst case condition. lhere will be approximately 42 entering trips and 2 exiting <br />trips in the A{+�+1 peak hour and 2 entering trips and 42 exiting trips in the PIVI peak hour. <br />Upon completion the site will have no Full -time staff. There will be 1 -2 employees that will service this <br />site once every several months. The result is that this site is expected to generate less than 1 trip per <br />day on average. Table 1 below summarizes the anticipated trip generation of the site. <br />Table ') <br />Solar Farris Traffic Generation Vehicle <br />Daily AM Peak Hour PIT Peak Hour <br />Scenario <br />In Out In Out In Out <br />Construction <100 <190 42 2 2 42 <br />Build -out <1 <1 M1 <1 <1 <1 <br />Please feel free to conlact me at 919- 653.2948 or trpyis.fluittakimle+Lhorn.G(inti with any question or <br />comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.