Orange County NC Website
225 <br />RECOMMENDATION: <br />Neither the Planning Board or staff have received any comments from local residents and property owners <br />indicating they do not believe the proposed facility complies with the provisions of Section 5.3.2 (A) (2) inclusive. <br />These standards include maintaining or promoting the public health, safety, and general welfare; maintaining or <br />enhancing the value of contiguous property; the use being in harmony with the area in which it is to be located; <br />and the use being in compliance with the general plan for the physical development of the County. <br />Planning Board and staff have reviewed the application, the site plan, and all supporting documentation and have <br />found that the applicant complies with the specific standards and required regulations as outlined within the UDO <br />with respect to the submittal of required information for the project. <br />Provided the Board of County Commissioners (BOCC) finds in the affirmative on the specific and general <br />standards as detailed herein, and no evidence is entered into the record demonstrating the applicant has either: <br />a. Failed to meet their burden of proof that the project complies with the specific development standards for a <br />solar array — public utility; or <br />b. Fails to comply with the general standards detailed within Section 5.3.2 (A) (2) of the UDO <br />the BOCC could approve the application. In the event that the BOCC makes an affirmative finding, the Planning <br />Board and staff recommends the attachment of the following conditions: <br />1. In accordance with Section(s) 6.13 and 6.21 of the UDO, and consistent with the <br />approved application, the applicant shall maintain and preserve the area in the <br />northeastern corner of the property encumbered by the Special Flood Hazard Area <br />(SFHA) as depicted on recently adopted FEMA Flood Maps, and the associated 80 foot <br />wide adjacent stream /floodplain buffers. <br />With the exception of installing public and /or private water and /or public sanitary sewer <br />and /or the removal of dead, diseased, or dying plant materials, this 4.25 acre area shall <br />remain undisturbed as required within the UDO. <br />2. In accordance with Sections 6.13, 6.21, and 5.9.6 (C) of the UDO, the applicant shall <br />cause a formal and detailed landscape and tree preservation plan to be submitted and <br />approved by the Orange County Planning Department within 180 days from the approval <br />of this Special Use Permit. This plan shall also incorporate the preservation of <br />environmentally sensitive areas such as jurisdictional streams, wetlands, floodplain <br />areas, and all required stream /floodplain buffers. <br />3. In accordance with Section 7.14 of the UDO, the applicant shall cause a plat to be <br />submitted and recorded to illustrate all lease, access, and utility easements on the <br />subject area. <br />4. Per Section 2.5 of the UDO, the applicant shall complete and submit a formal application <br />to the Orange County Inspections Department requesting authorization to commence <br />construction of the proposed solar array. The application, including all applicable fees, <br />shall be submitted within 180 days from the approval of the Special Use Permit. <br />5. To ensure public safety as outlined in Section 5.3.2 of the UDO, the Orange County Fire <br />Marshal's office shall review and approve the final site plan and ensure that any and all <br />modifications be made to address fire code and access issues prior to the issuance of <br />the permit authorizing the commencement of land disturbing activities. <br />