Browse
Search
Agenda - 5-a - Class A Special Use Permit – Solar Array off US Highway 70 in Cheeks Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 02-06-2018
>
Agenda - 5-a - Class A Special Use Permit – Solar Array off US Highway 70 in Cheeks Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:59:59 AM
Creation date
2/2/2018 10:28:57 AM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
224 <br />REQUIREMENT <br />UDO <br />SUPPORTING EVIDENCE <br />Planning Board / <br />BOCC <br />Staff <br />FINDINGS <br />Recommendation <br />SPECIFIC STANDARDS <br />In accordance with Section 5.3.2 (A) (2), the Board of County Commissioners shall also consider the following general <br />conditions before the application for a Special Use can be approved. <br />NOTE: The Following represents the recommendation of the Planning Board and staff based on the information available <br />prior to the public hearing. <br />The use (will / will not) maintain or <br />Section <br />Application package and <br />The use Will <br />promote the public health, safety and <br />5.3.2 (A) <br />testimony from applicant and <br />maintain ... <br />general welfare, if located where <br />(2) (a) <br />their subject matter experts <br />proposed and developed and <br />on how the project complied <br />operated according to the plan as <br />with the UDO. <br />submitted. <br />Section <br />Application package and <br />The use Will <br />The use (will / will not) maintain or <br />5.3.2 (A) <br />testimony from applicant and <br />maintain ... <br />enhance the value of contiguous <br />(2) (b) <br />their subject matter experts <br />property (unless the use is a public <br />on how the project complied <br />necessity, in which case the use need <br />with the UDO. <br />not maintain or enhance the value of <br />contiguous property). <br />Section <br />Application package and <br />The location and <br />The location and character of the use, <br />5.3.2 (A) <br />testimony from applicant and <br />character of the <br />if developed according to the plan <br />(2) (c) <br />their subject matter experts <br />use, if developed <br />submitted, (will / will not) be in <br />on how the project complied <br />according to the <br />harmony with the area in which it is to <br />with the UDO. <br />plan submitted <br />be located and the use is in <br />Will be ... <br />compliance with the plan for the <br />physical development of the County <br />as embodied in these regulations or in <br />the Comprehensive Plan, or portion <br />thereof, adopted by the Board of <br />County Commissioners. <br />
The URL can be used to link to this page
Your browser does not support the video tag.