Orange County NC Website
17 <br />RE: Per Orange Caunt Planning & In tions Department Application for Special use Permit <br />Detailed description of proposed land use: <br />The Special Use permit request Is for a ground mount solar generating plant. Oakwood Solar <br />Farm, LLC Is located on US Highway Iii in Mebane, NC. The PIN to the parcel of the Solar farm <br />proposed Is 9835 -02- 9317. The PIN to the site access agreed upon VAth the landowner is 9835- <br />10 -3858. The existing soils consisted In the project area are "GeBA" Georgeville silt loam and <br />"GeC" GeorgewiIle silt loam, The rn ajorlty of the site is comprised of scrub /shrub vegetation. <br />The site was cleared for timber purposes 3 -5 years ago. The southeast portion of the site Is <br />used as staging for Glace Grading Company, Inc. Two Jurisdictional man-made open water <br />ponds with a 65 foot buffer are located on the southern and northwestern portions of the <br />boundary, respectively. A stream Is located on the northeast portion of the boundary with an <br />80 foot buffer. The site will meet and exceed the buffer regulations (depicted on the site plan). <br />No buildings are Located within the site boundary. FIRM panel 9835 Indtcates the projects limits <br />are not within a .special flood hazard area (attached). The site is located within the Back Creek <br />Protected Watershed {overlay District and Efland- Cheeks Hwy 70 Overlay'District (pre- <br />designated commercial area). Project will use no groundwater or have Impact on water table <br />or groundwater. Project constructlon and operation has nD Impact an wetlands. Project site <br />Latitude is 36° 5`27.08"N and Longitude is 79014'0.07 "W. <br />The proposed ground -mount solar farm will consist of fixed' solar parcels, racking arrays with <br />driven posts, pad mounted Inverter /and transformer areas (as depicted on the site plan) and a <br />chain fink fond wv barbed wire to keep safe and secure the site. Land Is not ,pawed and is left <br />virtually undisturbed. <br />A Type D Landscaping buffer will be planted where existing natural vegetation is not consistent <br />with the County requirements (depicted on site plans). Site access will be through PIN 9835 - <br />103 -558 which has been agreed with the landowner. During construction It is estimated that a <br />maximum of 40 workers will be on site each day with less than 100 trips In /out of the site to <br />occur approximately 4 months of construction until completion (attached Trip Generation <br />report) The site will be odorless, un- manned, produce no waste, and create a tax (case for the <br />County. Remote monitoring will be In place for energy productfon reasons. <br />