Orange County NC Website
13 <br />E, STATE PERMITS REQUIRED <br />11. Does the proJoct Involve the mining of earth products? RSA l <br />If so, how many cable teed of materlal are expected to be <br />excavated? NA <br />Has an applpcall ❑n for a N4lning Permit been submitted 10 <br />NODRCD? -NA <br />Haase rtilach map Indicating expected extent of proposed activity. <br />2.. Does the proJect Involve generation or storage of hazardous or <br />tOx ?e wastes, as Ideritii ed by the Environmental Protectioxl <br />Agency? (A listing of all hazardous materials Is a;vallable from [he <br />Planning Department) <br />Describe the wastes to be generated, No ernlsslons or hazardous <br />3 [dslg fs generated or emaited from the farm, <br />How much materlal Is expected to be genorated per month? <br />NA <br />Will any material be treated onslie? NA <br />Volume? NA <br />Will any rnaterleI be store (I onside? NA � <br />Volurna7 NA _ <br />Where will disposal of the rnaterlal tale place? <br />How wJJI materlals be tratisperted to the disposal slle? <br />What measures are proposed to protect water quailty and alr <br />quallty In case of SPANS? <br />NA <br />r� <br />I <br />j� <br />I I <br />