Orange County NC Website
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />34 <br />lease terms on the Orange Correctional site. During the same springtime period, the Board <br />asked staff to investigate potential sites along the Highway 70 /Cornelius Corridor (the area <br />around Highway 70 between West Hill Avenue and Saint Mary's Road) for the Environment and <br />Agricultural Center as an alternative to remodeling the current facility. <br />The Detention Center site assessment initially included two sites in downtown Hillsborough, the <br />existing jail location and the parking lot adjacent to the Courthouse. However, preliminary <br />findings revealed several significant challenges related to those sites, so the assessment area <br />was expanded to include sites outside of the downtown area. Based upon this analysis and <br />recommendation, the County has entered into Purchase & Sale Agreements (Attachment 3) <br />with the owners of the parcels, subject to and contingent upon a rigorous examination period <br />and final BOCC approval to settle the transaction and acquire the property. <br />Jeff Thompson made the following PowerPoint presentation: <br />Multi- Purpose County Campus Site Update <br />January 23, 2018 <br />Purpose <br />• Ratify County Manager's recommendation to pursue purchase of the "Hwy 70 Site <br />Assembly" that addresses multiple County Capital Investment Plan initiatives; <br />• Authorize the County Manager to continue site due diligence to include the pursuit of <br />necessary future land use and zoning amendments with the Town of Hillsborough <br />Background <br />• BOCC direction: <br />- Detention Project site study of downtown sites <br />- Environment and Agriculture Center Study (Cornelius Corridor) <br />- Expansion of Detention site study <br />• Analysis and recommendations discussions in late 2017 <br />Analysis and Recommendation Summary (pg. 1 -3 of abstract) <br />1. Existing Detention Site <br />2. Site adjacent to Justice Facility <br />Both incur excessive costs, no expansion ability, challenging zoning compliance <br />and permitting process <br />3. Coleman Loop Site <br />Challenging sewer extension cost, expensive acquisition cost, existing facility <br />oversized, removal from commercial tax base <br />4. Hwy 70 Site Assembly (recommended) <br />— Shared, accessible infrastructure <br />— Site versatility, efficient location for operations <br />— Expansion capability, shared site and utility costs for multiple uses <br />— Supported by Hillsborough (see abstract attachment #2) <br />Ongoing Site Analysis (Pa. 3 of abstract) <br />• Land Records Assessment <br />• Physical Investigations <br />• Land Use Amendment Process (Hillsborough) <br />