Browse
Search
Agenda - 08-22-2006-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 08-22-2006
>
Agenda - 08-22-2006-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:27:55 PM
Creation date
8/29/2008 9:40:22 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 20060822
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3~ <br />MINUTES <br />ORANGE COUNTY PLANNING BOARD <br />MAY .3, 2006 <br />REGULAR MEETING <br />MEMBERS PRESENT: Jay Bryan, Chapel Hill Representative (Chair); Brian Dobyns, Cheeks <br />Township Representative; Craufurd Goodwin, Hillsborough Representative; Michelle Kempinski, <br />Cedar Grove Township at Large; .Ioel Knight, Little River Representative; Bernadette Pelissier, <br />Bingham Township; Renee Price-Saunders, Hillsborough Township at Large; Sandra Johnson <br />Quinn, Eno Township <br />MEMBERS ABSENT: Sam Lasris, Cedar Grove Township At Large; Jeffrey Schmitt, Cedar <br />Grove Township at Large <br />STAFF PRESENT: Robert Davis, Current Planning Supervisor; Sherri Ingersoll, Administrative <br />Assistant II; Eddie Kirk, Planner II; Michael Harvey, Planner II; Glenn Bowles, Planner II <br />AGENDA ITEM #8: PRELIMINARY PLAN FOR 7HE ORCHARD SUBDIVISION (VOTING <br />ITEM) <br />Presenter: Glenn Bowles, Planner II <br />Planning Board to hear Staff Report to make recommendation to the <br />County Commissioners regarding the Preliminary Plan application for <br />the Orchard Subdivision, <br />Glenn Bowles: (Reviewed Abstract). Lot numbers 10 and 11 have been reoriented so that all the <br />platted land is not in primary open space as the concept plan approval required. As a result of the <br />Fire Marshal's comments, the developer has approached OWASA to use the University Lake as a <br />source of water for fire suppression, OWASA has agreed but the specifics or design have not <br />been completed, The Carrboro Courtesy Review requested a trail system around the property, but <br />Staff' does not agree because of the concern for erosion on steep slopes and maintaining the <br />pristine environment. Also, they requested that the cul-de-sac be constructed to the eastern edge <br />of the property. Staff' was concerned about extending the road because the non-use of the road, <br />the expected deterioration of the road due to no use, and there is question if and when the <br />adjacent property maybe developed and at what grade the road on the other side would be. Staff <br />did not want the road to be paved twice if the grades do not match. <br />Michelle Kempinski: Originally there was a question if' the Tanaka property should be <br />considered as part of this subdivision when determining the number of allowable lots.. When the <br />subdivision was redrawn to exclude the Tanaka tract, was the number of allowable lots <br />readjusted? The number of lots is pertinent, as it comes up with one less lot., <br />Jay Bryan: Your question to Glenn is how was the 181ots determined? <br />Michelle Kempinski: Yes, My calculation is lower. <br />Jay Bryan: Would it be helpful to have the developer explain the calculations or the staff? <br />Bruce Ballentine: The calculations ar'e not only based on density. The underlying density is <br />based nn the parent tracts of land as of October 2, 1989. When the regulations changed in the <br />County, you calculate the density by going back to legal lots on that date (2 tracts), multiplied by <br />5 acres and the rest at 5 acres; the TanakaBennett original property was 47.91 acres, and was part <br />of the parent tract. An additional calculation is the yield analysis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.