Orange County NC Website
t'1 b <br />7 In accordance with the General Statute 1.36-102.2, new roads are not eligible for the State <br />Maintenance system unless certain requirements are met. An explanation of these requirements can <br />be found on pages 13, 14, and I S of'the current (January 2000) NCDOT Subdivision Roads Manual. <br />Particular attention should be placed on items 2 (petition for addition), 5, 6, and 7 (occupied housing <br />requirement), 10, 11, 12, and 13. (Please note that the subject road is not eligible for addition as a <br />private road..) <br />8 Any area within the State's right of way and/or easements disturbed during the construction and/or <br />maintenance shall be repaired to the satisfaction of the District Engineer or his representative. <br />9. Before planting any landscape within the right of way, the encroaching party shall submit an <br />application for a planting permit to this office. The permit must be approved prior to installing any <br />plants. <br />0 It is the responsibility of the applicant to provide a copy of this letter and the above-referenced <br />documents to the owner/developer so they may be fully informed. <br />If you have any questions, feel free to call Nanette Fogleman or' me at (336) 570-6833. <br />Sincerely r` <br />-, ~ ~'~ <br />~~ ~ <br />C. N. Edwards, Jr: P.E. <br />District Engineer <br />Attachments <br />cc: 1. M. Mills, P. E, Division Engineer <br />Orange County Planning Department <br />CNL-MDF/ndP <br />SFA060630 The Orchard <br />