Browse
Search
Agenda - 08-22-2006-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 08-22-2006
>
Agenda - 08-22-2006-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:27:55 PM
Creation date
8/29/2008 9:40:22 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 20060822
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tea <br />a,. snrF„ <br />~~w.d <br />STATE of NORTH CAROLINA <br />DEPARTMENT OF TRANSPORTATION <br />MICHAEL. F'.EASLEY <br />GOVERNOR <br />June 30, 2006 <br />ORANGE COUNTY <br />Jamie Collings <br />Ballentine Associates, P.A <br />221 Providence Road <br />Chapel Hill, North Carolina 27514 <br />L.YNDO 7IPPL-TT <br />SECRETARY <br />SUBJECT: Final Plan Review: The Orchard Subdivision Located on Jones Feny Road (SR 1942) <br />Dear Mr. Collings: <br />This office has completed its review of the subject's proposed final plans for compliance with current <br />Department of Transportation minimum subdivision construction standards. We wish to advise that the <br />final plans received at this office are approved. Pursuant to this approval, this office will require you to <br />make the owner/developer aware of the Following requirements before starting any construction. <br />l .. The driveway permits for this subdivision was previously approved. (D-06-30-06-0-1 ). <br />2. Certification of Pavement Conformance (Forms QMS-MV2 and QMS-MVl) must he filled out <br />and returned to the District Office thirty (.30) days prior to the installution of asphalt materials. <br />3. The NPDES Stormwater Permit Compliance Certification and the Verification of Compliance <br />with Environmental Regulations forms must be filled out and returned to the District Office. <br />4 During the construction phase, the owner/developer will contact the Graham District Office before <br />each of the following phases: (A) Drainage, (B) Grading, (C) Placement of base, (D) Paving, and (EJ <br />Seeding.. Failure to notify this office before each phase of construction mayjustify verification <br />certified and signed by a professional engineer. <br />5. A mandatory Preconstruction conference is to be scheduled with this office prior to any <br />construction. Contact Shawn Smith, Transportation Technician III, at.336-570-68.3:3 to <br />scheduled this meeting. <br />6 When working within the State's right of way, the owner/developer will contact the Graham District <br />Office before each of the following phases: (A) Drainage, (B) Grading, (C) Placement of base, (D) <br />Paving, and (E) Seeding, Failure to notify this office before each phase ofconstruction mayjustify <br />verification certified and signed by a professional engineer. <br />P. O 130X 766 GRAHAM, NC 27253 <br />
The URL can be used to link to this page
Your browser does not support the video tag.