Orange County NC Website
Ibc <br />14 The District Office must be consulted if there are any changes in the plans as they were submitted. <br />15 For your general information: <br />The $50.00 inspection fee for this driveway connection was paid by check. (Check # 3131) <br />A Performance Bond requirement of $50,000 shall be posted prior to construction beginning <br />on SR 1942 (Jones Terry Road). <br />