Orange County NC Website
Bid Tabulation for the Durham Technical Community College <br /> Orange County Off-Campus Center Classroom Building <br /> DCC#1499 File#05-06376-01 <br /> Bids Received: June 29,2006 <br /> Single-Prime Alternate 43 Alternate 94 Alternate#5 Alternate#6 Alternate#7 Alternate#8 Alternate#9 <br /> General Contractors Photovoltaic Solar Water Rainwater Waterless Operable Park&Ride Eliminate <br /> System Heating System Reuse System Urinals Window Vents Facilities info Kiosk <br /> 1.H.Allen,Inc. $18,000.00 $37,000.00 $205,000.00 $4,000.00 578,000.00 S362,000.00 (S 16,800.00) <br /> American South $8,500.00 $54,000.00 $213,000.00 3700.00 $39,000.00 S355,000.00 ($18,000.00) <br /> Barnhill Contracting Co. 514,000.00 535,000.00 5195,000.00 $500.00 $40,000.00 $351,000.00 ($25,000.00) <br /> R.L.Casey,lnc. $14,240.00 $34,121.00 $166.964.00 $3,121.00 539,634.00 $299,417.00 ($15,765.00) <br /> Centurion Construction Co. $16,700.00 $34,700.00 $192,100.00 $400.00 $38,500.00 5307,700.00 (532,400.00) <br /> Harrod and Assoc. $8,300.00 S28,000.00 $209,000.00 5400.00 555,000.00 $320,000.00 (537,000.00) <br /> vILB Const.Services $16,800.00 535,600.00 $195,000.00 5700.00 $36,800.00 5341,000.00 ($21,500.00) <br /> N.C.Monroe Const.Co. $17,600.00 $35,000.00 $199,000.00 ' (S400.00) $73,200.00 $444,000.00 (521,800.00) <br /> C.T.Wilson Construction $14,950.00 $34,729.00 5193,226.00 ($403.00) $77,577.00 $397,583.00 ($19,777.00) <br />