Bid Tabulation for the Durham Technical Community College
<br /> Orange County Off-Campus Center Classroom Building
<br /> DCC# 1499 File# 05-06376-01
<br /> Bids Received: June 29, 2006
<br /> Single-Prime Bid Min. Add. Alternate mlA Alternate#lb Altemate#2
<br /> General Contractors Lic. # Bond Bus. Recd. Base Bid Wood Science Wood/Steel Aluminum
<br /> Casework Science Cswk. Light Shelves
<br /> J.H. Allen, Inc. 3921 • • • $5,672,000.00 $214,000.00 $251,000.00 S155,000.00
<br /> American South 34536 • • • $5,829,000.00 $212,000,00 $224,000.00 S116,000.00
<br /> Barnhill Contracting Co. 3194 • • • $5,839,000.00 $208,000.00 $247,000.00 SI07,000.00
<br /> R. L. Casey, Inc. 10137 • • • $5,692,214.00 $241,784.00 $108,450.00 $45,324.00
<br /> Centurion Construction Co. 12332 • • • $6,199,000.00 $208,800.00 $273,200.00 $54,000.00
<br /> Harrod and Assoc. 32"91 • • • $5,776,000.00 $218,000.00 $263,000.00 S 139,000.00
<br /> ML13 Const. Services 56418 • • • $5,555,000.00 5205,000.00 $243,000.00 $124,000.00
<br /> N. C. Monroe Const. Co. 2393 • • • $5,980,000.00 5240,400.00 $255,000.00 $118,000.00
<br /> C.T. Wilson Constriction 2443 • • • $5,611,309.00 5224,380.00 $261,694.00 5126,617,00
<br /> Bids as shown above, received at 3:00 pm,Thursday,June 29, 2006,00/w have been checked,validated°a;i�o9rjl�ereby certified as correct.
<br /> o ��L ``••"". Q.h nri
<br /> WrKe . th foot,AIA 656
<br /> 14a3a:e31��t
<br />
|