Browse
Search
Agenda - 7-a - Connect 2045 Metropolitan Transportation Plan
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 02-06-2018
>
Agenda - 7-a - Connect 2045 Metropolitan Transportation Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 5:26:07 PM
Creation date
2/1/2018 4:51:54 PM
Metadata
Fields
Template:
BOCC
Date
2/6/2018
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Highlight <br />DCHC MPO - CAMPO - <br />• $7.5 Billion Road, Bike & Ped • $27.7 Billion Road, Bike & Ped <br />• $4.7 Billion Transit • $6.7 Billion Transit <br />• Includes transit investments geared towards: increased frequency, <br />expanding service, redesigning networks, new services, improved <br />infrastructure, electric busses, and last -mile connections. <br />Total CAMPO DCHC MPO <br />$1,207,000,000 $915,000,000 $292,000,000 <br />• Discusses autonomous vehicle through improvements in the regions <br />IntelligentTransportation Systems (ITS). <br />$15,000 <br />$10,000 <br />$5,000 <br />c <br />0 <br />2 $o <br />($5,000) <br />($10,000) <br />Financial Plan <br />IF 1W I I ..' R L., . R <br />■ 1 IP `1 1 a' <br />TIP '18 —'25 126 —'35 136 —'45 <br />• DCHC MPO Highway Costs DCHC MPO Transit Costs <br />• DCHC MPO Highway Funding DCHC MPO Transit Funding <br />• CAMPO Highway Costs CAMPO Transit Costs <br />• CAMPO Highway Funding CAMPO Transit Funding <br />1/31/2018 <br />8 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.