Browse
Search
Agenda - 08-22-2006-5y
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 08-22-2006
>
Agenda - 08-22-2006-5y
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:28:36 PM
Creation date
8/29/2008 9:40:06 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Document Type
Agenda
Agenda Item
5y
Document Relationships
Minutes - 20060822
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />• does not having public water/sewer impact the capacity of the meeting room <br />• how will summertime solar gain be handled <br />• will the windows be operable <br />• what are some of the non-standard/atypical materials being considered for use <br />• discuss the parking area and outdoor lighting <br />• what is being considered for shading and surface water runoff <br />• will the collection trucks be parked there <br />• if truck parking was moved there in the future, where would they likely be parked <br />• are there any easements at the southern end of the lot <br />• is the project being planned taking into consideration that Eubanks Road may sometime be <br />widened and could we be asked to grant more right of way <br />• what additional traffic will be generated on Eubanks Road by this facility <br />• how sensitive are septic fields to traffic <br />• what are other possibilities for septic field locations <br />what is the estimated cost of the building <br />• what is the project timeline assuming the BOCC proceeds with the project <br />• will we have to wait until after the winter to begin construction <br />The project timeline at this point contemplates completion of the final design and construction <br />documents by mid-August, completion of bid documents in late September or early October, <br />solicitation of bids in mid-October, and award of construction bids by the BOCC in late <br />November. If the BOCC endorses this general timeline, staff plan to present a project progress <br />report at the August 22, 2006 BOCC meeting. <br />Barring extraordinary problems or delays, the facility should be completed and move-in targeted <br />for late summer to fall 2007. The lease to the current Solid Waste administrative facilities <br />expires December 31, 2006. The Town of Chapel HiII Public Works Department plans to vacate <br />the site by January 1, 2007. Informal discussions with UNG Facilities staff suggest that the <br />University will likely be receptive to considering a new short-term lease to the County for the <br />period necessary for the new Solid Waste Operations Center to be completed and for the <br />existing modular office unit to be moved from University property. <br />Consistent with recent Board practice, Solid Waste staff plan to coordinate with Environment <br />and Resource Conservation Department staff to engage the services of a consultant to perform <br />a cultural and archeological assessment of the approximate 10-acre site. <br />FINANCIAL IMPACT: Funding far the design of the facility has already been included in the <br />Solid Waste Management Department's 2005-06 operating budget. Construction of the new <br />facility will be addressed through debt financing to be repaid from revenues earmarked in future <br />years in the Solid Waste/Landfill Operations Enterprise Fund. <br />RECOMMENDATION(S): The Manager recommends that the Board: <br />1) receive for information the discussion points noted above from the May 31 neighborhood <br />meeting; <br />2) direct staff to engage a qualified consultant to conduct a cultural and archaeological <br />survey of the Solid Waste Operations Center property; and <br />3) endorse the general project timeline outlined above, including a status report on detailed <br />design of the facility to the BOCC at the August 22, 2006 meeting.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.